Skip to main content

install

Installation Guide

Installation to Voron Stealthburner

Antenna Installation

FPC Installation

  • Install the FPC ribbon according to the above image (make sure the FPC cable is not inserted backwards, with the blue side facing up).

Mounting Bracket Installation

Thread the FPC through the hole as shown in the above image.

As shown in Image 1, align the lower clip first, then insert the upper one. Image 2 shows the installed state.

Installation of Adapter Board and Connection Wires

  • The wire exit position can be adjusted according to your preference and does not necessarily have to be against the back of the fan.
Note
  • Wire color explanation: Black is negative GND, Red is positive VCC with an acceptable voltage range of DC12-24V, White is GPIO47 which can be used for material detection, Yellow is GPIO48 which can be used for machine shutdown after completion.

Installation to Filament Detection

  • To be updated