install
Installation Guide
Installation on Voron Stealthburner
- Installing the Halo on the Stealthburner requires the adapter provided by us
- First, download and print the model provided by us
- Click the download link below
-
Loading...
Antenna Installation
Loading...
Loading...
FPC Installation
- Install the FPC ribbon cable as shown in the above image (ensure the FPC cable direction is correct, with the blue side facing up)
Loading...
Loading...
Fixing Bracket Installation
Loading...
Loading...
Loading...
Loading...
Pass the FPC through the cable hole as shown in the above image
Loading...
Loading...
As shown in step 1 of the above image, first align the bottom buckle, then press the top part in. Image 2 above shows the completed installation
Loading...
Loading...
Install the Adapter Board and Connection Cable
- The cable exit position can be adjusted according to your preference; it does not have to be attached to the back of the fan
Loading...
Notes
- Cable color explanation: Black is negative GND, Red is positive VCC, accepts DC 12-24V, White is GPIO47, can be used for filament jam detection, Yellow is GPIO48, can be used for print completion shutdown
Installation on Filament Detection
- To be updated
Loading...